Saturday, September 16, 2017
Mix It In
I joined Ingo on another "pipe-walk", this time we took a different route, also through the park.
Who knows how long the fountain will be up now.
We enjoy as long as it takes, right?
We also checked if there is a way to sneak through the lighted construction site - and there is.
I mean, can you believe this?!
The construction site will be done end of... 2018!!! :-(, BIG :-(
So far I have to walk through the pitch-dark park with a torch to work.
I asked online if they can solve that problem and got a paper letter back that they´re working according to plan.
Quite frankly I hope Dipl.-Ing. B has a young daughter who has to take such a dark route, too - bet the problem´d be solved in a day.
I´m still thinking of answering online and ending with Dipl.-Ing. (FH), too!
(FH means I´ve actually worked with my hands also, not just theoretical knowledge).
But let´s try to end on a light note, right?
Some very, very tall guy installed a swing. Ingo is tall enough to actually hop on!
Wet, dark, high, oh, what kind of a mix, right?
Subscribe to:
Post Comments (Atom)







4 comments:
Maybe you should answer back Iris. Are there a lot of people using that way in the dark? Maybe a signed petition would work.
Oh, Sami, this is Germany.. two other people join me - on push-bikes, not a chance...
Maybe I try, tough!
Keep complaining until they get so tired of it they say OK oK and do something 😀
They'll just let me know they work after plan, Grace. They won't get tired of doing so.
Post a Comment